Thanks Ameya,
Variance is not visible in CO03 ,since product costing is happening outside ECC.
Hence WIP is not getting captured, due to missing valuation variant
for now ,developed a query to look into scrap posting via confirmation table and multiply with standard price to get the required scrap value