Any help?
I'm talking about something similar to the following example:
MRP runs and on plant A, requirement for material 1 is 5,000 kg for the month
material 1 can be run on 5 different production lines/machines
In MF50, I want to split the orders such that everyday there is production of material 1 for 5 days
capacity for each of the production lines is 500kg
so it should split into something like
day1:
machine 1: 500
machine 2: 500
day2:
machine 1: 500
machine 3: 500
(machine 2 was busy producing another SKU)
day3:
machine 1:500
machine 2:500
so on...