Hi Nilesh,
1. Check and monitor various config status in LTR.
2. Check and make sure SLT connections are working fine: RFC with source and DB Connection with Target. Use RS_ORDER table to check connection with HANA System.
3. Keep monitoring the various SLT Jobs related to each configuration.
- Master Job (Monitoring Job) : Starts with (IUUC_MONITOR_<MT_ID>
- Master Controller Job : Starts with IUUC_REPLIC_CNTR_<MT_ID>
- Data load Job : Starts with DTL_MT_DATA_LOAD_<MT_ID>_<2digits> etc.
4. Check and monitor the applicaiton logs of each configuration via LTRC.
Check and refer the SLT Operational Guide for more details.
Thanks